Every job below is one we do ourselves across Bartlett.
We frame new decks with joists sized to actual span tables, not guesswork, and set footings below frost depth so the frame doesn't heave. You pick pressure-treated pine, cedar, or composite decking, and we size the joists differently depending on which one you choose.
Soft boards, sagging frames, and railings that move when you lean on them usually trace back to one bad connection. We find the actual failure, whether it's a rotted ledger board, a rusted joist hanger, or a post never anchored to a footing, and fix that instead of patching the surface.
Pine decking left unsealed will gray and cup within a season or two down here. We pressure wash, let the boards dry out fully, then stain and seal so the wood keeps shedding water instead of soaking it up.
Multi-level decks, built-in benches, and stairs that land where your yard actually slopes get drawn up before we cut a single board. We work around trees, drainage, and the grade instead of forcing a flat rectangle onto a sloped lot.
Composite boards don't rot, splinter, or need restaining, but they expand and contract more than pine, so the fastening and gapping has to account for that. We install brands like Trex and TimberTech with hidden fastener systems for a clean top surface.
Railings have to survive a 200-pound load pushed sideways at the top rail, and baluster spacing has to stay under 4 inches to pass inspection. We anchor posts through the frame, not just into the decking, so a railing doesn't wobble the first time somebody leans on it.
Turning a deck into a screened porch means dealing with a roof tie-in, ceiling framing, and screen track that has to stay square. We handle the framing and roof flashing so the porch doesn't leak where it meets the house.
Sometimes the frame underneath is still solid and it's just the top boards that have cupped, split, or gone soft. We pull the old decking, check every joist while it's exposed, and lay new boards without rebuilding the whole structure.
Old decks nailed together instead of screwed, or built without any flashing at all, usually aren't worth saving. We tear them out, haul off the old lumber, and rebuild to current code from the footings up.
A pergola or a solid roof over a deck changes the load on the posts and footings, so it has to be engineered for that before it's built, not added on after. We size the posts and beams for the added weight and wind load, not just for looks.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
If your town isn't listed, call and ask, we probably still cover it.
Questions that come up once a project is actually underway.
Describe the problem and we will tell you what it probably is. No obligation.